EasyManuals Logo
Home>Suzuki>Motorcycle>RM-Z250

Suzuki RM-Z250 Service Manual

Suzuki RM-Z250
411 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #90 background imageLoading...
Page #90 background image
5-6 ENGINE REMOVAL AND INSTALLATION
INSTALLATION
Install the engine in the reverse order of removal. Pay attention to the following points:
Fit the swingarm in its position and hold it with the swingarm pivot shaft.
Mount the engine on the frame.
Tighten the engine mounting bolts, nuts and swingarm pivot shaft nut to the specified torque.
NOTE:
After the engine has been installed and run, make sure to retighten the fasteners as they are subject to
becoming loose.
The engine mounting nut is the self-lock type and cannot be used repeatedly. If the self-lock
effect is lose, replace it with a new one.
a Shim ITEM N·m kgf-m lbf-ft
A 45 4.5 32.5
BC 66 6.6 47.5
D 70 7.0 50.5
EF 40 4.0 29.0
LH
RH

Table of Contents

Other manuals for Suzuki RM-Z250

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Suzuki RM-Z250 and is the answer not in the manual?

Suzuki RM-Z250 Specifications

General IconGeneral
BrandSuzuki
ModelRM-Z250
CategoryMotorcycle
LanguageEnglish

Related product manuals