8
Maintenance
8-8 bizhub C250P (Phase 3)
To empty the hole-punch waste container in Finisher FS-603
Follow the procedure described below to empty the hole-punch waste
container.
1 Slide the finisher away from the
machine.
2 Pull out the hole-punch waste
container.
3 Empty the hole-punch waste
container.
4 Install the hole-punch waste container into its original position.
5 Slide the finisher back against the machine.