SLC™ Console Manager User Guide 29
3: Installation
This chapter provides a high-level procedure for installing the SLC console manager followed by
more detailed information about the SLC connections and power supplies.
Caution: To avoid physical and electrical hazards, please be sure to read
Appendix C: Safety Information on page 318 before installing the SLC
device.
It contains the following sections:
What’s in the Box
Technical Specifications
Physical Installation
What’s in the Box
In addition to the SLC console manager, Table 3-1 lists the components in the box and part
numbers.
Table 3-1 Component Part Numbers and Descriptions
Component
Part #
Description
Adapters
200.2066A Adapter: DB25M (DCE), Sun w/DB25 female
200.2067A Adapter: DB25F (DCE) to RJ45, Sun w/DB25 male and some HP9000s
200.2069A Adapter: DB9M (DCE) to RJ45, SGI Onyx
200.2070A Adapter: DB9F (DCE) to RJ45, HP9000, SGI Origin, IBM RS6000, and PC-based Linux
servers
ADP010104-01 Adapter: RJ45 rolled serial, Cisco, and Sun Netra
Note: An optional adapter for an external modem is available from Lantronix. The part number is 200.2073
and description is DB25M (DCE) to RJ45.
Cables
200.0063 Cable: RJ45 to RJ45, 6.6 ft (2 m)
500-153 Cable: Loopback
Power Cords
500-041 For single AC models: one AC power cord
For dual AC models: two AC power cords
083-011 For dual DC models: one accessory kit, containing DC plug connectors and instructions
Documentation
Quick Start Guide and SLC Console Manager User Guide available at
http://www.lantronix.com/support/downloads/
.