ENGINE REMOVAL
5-1
EAS23710
ENGINE REMOVAL
Removing the exhaust pipe assembly
Order Job/Parts to remove Q’ty Remarks
Lower side cowlings
Refer to “GENERAL CHASSIS” on page
4-1.
Bottom cowlings
Refer to “GENERAL CHASSIS” on page
4-1.
Radiator bracket Refer to “RADIATOR” on page 6-1.
1 EXUP valve pulley cover 1
2 EXUP cable 1 Black adjusting bolt
3 EXUP cable 1
4Clamp 1
5 Muffler 1
6Gasket 1
7
O
2
sensor
1
8 Exhaust pipe assembly 1
9Gasket 4
10 Exhaust pipe assembly bracket (left lower side) 1
11 Exhaust pipe assembly bracket (left upper side) 1
LS
LT
12
10
1
2
3
5
4
6
8
(8)
7
9
New
LT
T
R
.
.
20 Nm (2.0 m
•
kg, 14 ft
•
Ib)
T
R
.
.
20 Nm (2.0 m
•
kg, 14 ft
•
Ib)
T
R
.
.
20 Nm (2.0 m
•
kg, 14 ft
•
Ib)
New
T
R
.
.
7 Nm (0.7 m
•
kg, 5.1 ft
•
Ib)
T
R
.
.
7 Nm (0.7 m
•
kg, 5.1 ft
•
Ib)
T
R
.
.
8 Nm (0.8 m
•
kg, 5.8 ft
•
Ib)
T
R
.
.
45 Nm (4.5 m
•
kg, 32 ft
•
Ib)
T
R
.
.
30 Nm (3.0 m
•
kg, 22 ft
•
Ib)
T
R
.
.
34 Nm (3.4 m
•
kg, 24 ft
•
Ib)
LT
LT
T
R
.
.
7 Nm (0.7 m
•
kg, 5.1 ft
•
Ib)
13
16
14
15
3
2
T
R
.
.
7 Nm (0.7 m
•
kg, 5.1 ft
•
Ib)
11
T
R
.
.
10 Nm (1.0 m
•
kg, 7.2 ft
•
Ib)