CYLINDER HEAD
5-15
EAS24100
CYLINDER HEAD
Removing the cylinder head
Order Job/Parts to remove Q’ty Remarks
Engine Refer to “ENGINE REMOVAL” on page 5-1.
Camshafts Refer to “CAMSHAFTS” on page 5-7.
1 Coolant temperature sensor 1
2 Cylinder head 1
3 Cylinder head gasket 1
4 Dowel pin 2
For installation, reverse the removal proce-
dure.
1
2
3
4
T
R
.
.
1st 25 Nm (2.5 m
•
kg, 18 ft
•
lb)
2nd 42 Nm (4.2 m
•
kg, 30 ft
•
lb)
T
R
.
.
1st 30 Nm (3.0 m
•
kg, 22 ft
•
lb)
2nd 60 Nm (6.0 m
•
kg, 43 ft
•
lb)
T
R
.
.
18 Nm (1.8 m
•
kg, 13 ft
•
Ib)
T
R
.
.
12 Nm (1.2 m
•
kg, 8.7 ft
•
Ib)
New
New
(8)
T
R
.
.
20 Nm (2.0 m
•
kg, 14 ft
•
Ib)
E
E
E