5-2
ENGINE REMOVAL/INSTALLATION HRX217HYA • HRX217HZA
12.Squeeze the tabs, and remove the Roto-Stop cable from
the bracket.
.
13.Support the engine, and remove the two remaining
5/16-24 x 2-3/8 inch engine mounting bolts and the front
base plate.
14.Remove the engine.
INSTALLATION
Installation is done in the reverse order of removal.
Tighten the engine mounting bolts to the specified torque.
TORQUE: 19.6 ~ 23.6 N•m (14.5 ~ 17.4 ft-lb)
FRONT BASE
PLATE
BOLT, 5/16-24 x 2-3/8 in (2)
19.6 ~ 23.6 N•m (14.5 ~ 17.4 ft-lb)