Site Preparaon Checklist for an EX9214 Switch
The checklist in Table 44 on page 118 summarizes the tasks you need to perform to prepare a site for
installing an EX9214 switch.
Table 44: Site Preparaon Checklist
Item or Task For More Informaon Performed by Date
Environment
Verify that environmental factors such as
temperature and humidity do not exceed
switch tolerances.
"Environmental Requirements
and Specicaons for EX Series
Switches" on page 120
Power
Measure distance between external
power sources and switch installaon
site.
Calculate the power consumpon and
requirements.
"AC Power Supply Specicaons
for EX9214 Switches" on page
48
"DC Power Supply Specicaons
for EX9214 Switches" on page
54
"Power Requirements for
EX9200 Switch Components" on
page 57
Calculang the Fiber-Opc
Cable Power Budget for EX
Series Devices
Calculang the Fiber-Opc
Cable Power Margin for EX
Series Devices
Rack or Cabinet