Installing the Cable Management Bracket in an EX9214 Switch
Before you install a cable management bracket in the switch:
• Ensure you understand how to prevent Electrostac discharge (ESD) damage. See
Prevenon of
Electrostac Discharge Damage
.
Ensure that you have the following parts and tools available:
• ESD grounding strap
• 7/16 in. (11 mm) nut driver
You can install the cable management bracket below the line card and SF module slots on the front
panel.
To install the cable management bracket:
1. Aach the ESD grounding strap to your bare wrist and connect the strap to the ESD point on the
chassis.
2. Posion the cable management bracket on the studs on the lower part of the front panel. See Figure
92 on page 282.
3. Insert the nuts on the corners in the cable management bracket into the studs on the chassis.
281