cabinet is not horizontal, adjust the adjusting anchor by using a socket
wrench.
Figure 4-31 Leveling the cabinet
NO TE
Both the gap between cabinets and the vertical deviation should be no less than
3 mm.
2. Restoring the ESD oor.
Figure 4-32 Restoring the ESD oor
NO TE
The ESD oor has been removed before you determine the installation position of the
supports. Cut the ESD oor according to the size of the cabinet.
For underoor cabling, place the cables before you restore the ESD oor.
Installing Cabinet Doors
1. Installing the cabinet doors.
NO TE
Install the cabinet door after the inside components and cables. To install the
components inside the cabinets and cables, see the Installation Guide.
a. Align the door with the front face of the column.
b. Place the door on the lower lintel and close the door till the lower pin
automatically inserts into the hole in the lower lintel.
HUAWEI NetEngine 8000 F
Hardware Guide 4 Hardware Installation and Parts Replacement
Issue 05 (2023-03-31) Copyright © Huawei Technologies Co., Ltd. 372

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei NetEngine 8000 F and is the answer not in the manual?

Huawei NetEngine 8000 F Specifications

General IconGeneral
BrandHuawei
ModelNetEngine 8000 F
CategoryNetwork Router
LanguageEnglish

Related product manuals