Figure 4-68 Installing the ground cable between the device and cabinet
4.1.8 Post-Installation Check
Before starting the post-installation check, make sure that the power switches of
the external power supply system are in OFF position.
After completing installation of a device, check the items listed in the following
table. If any item fails the check, check for the reason, reinstall the related
component, and check again. Ensure that all the items pass the check.
Check cabinets according to Table 4-16.