No. Item Method
15 Power cables and ground cables are routed
straightly and properly bundled, with
sucient slack at the bend part.
Observe
16 Power cables, ground cables, and power
switches on power distribution boxes and
power distribution frames are identied by
correct, clear, and tidy labels.
Observe
17 The yellow-green ground cables are correctly
connected. One end of a ground cable is
connected to the PGND ground bar in the
power distribution cabinet, and the other
end is connected to the ground point on a
cabinet. Screws at both ends of a ground
cable are securely fastened.
Observe
Check the installation environment according to Table 4-62.
Table 4-62 Installation environment checklist
No.
Item Method
1 No ngerprints or other smears exist on the
surface of the equipment cabinet.
Observe
2 No excessive adhesive tapes or cable ties
exist on the cables.
Observe
3 No tapes, cable ties, wastepaper, or packing
bags are left around the equipment.
Observe
4 All the items around the equipment are neat,
clean, and intact.
Observe
4.2.9 Power-on Check