Hydraulics
B 1-9
Pump
Air
Section Check
1. Reduce
the
pump
air
pressure
to 0.
2. Remove
the
pump
cover.
3.
Make
sure the READY
light is lit and
the
pump
is
turned on.
4.
See
Figure
B 1-4.
Slowly
increase
pump
air
pressure
and
check for
leaks
.
at the actuator's
top or bottom exhaust
port (1)
.
at the top of the hydraulic
shaft
(2)
.
between
the air cylinder
head and the air cylinder or between the
air cylinder and
the
pump
mount
(3)
.
between
the actuator
and air cylinder
(4)
3
1
4
2
413003S
Fig. B 1-4
Checking for Pump
Air Section Leaks
1. Exhaust
ports
2. Top
of hydraulic shaft
3.
Between
air cylinder head and
air cylinder or between air
cylinder and
pump
mount
4.
Between
actuator and air
cylinder
@
2000
Nordson
Corporation
All
jights
reserved
41-3000v
lssued 5/00
Bl EN-02-[3V-X,AGXX]-2

Table of Contents

Other manuals for Nordson 3100V Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Nordson 3100V Series and is the answer not in the manual?

Nordson 3100V Series Specifications

General IconGeneral
BrandNordson
Model3100V Series
CategoryMelting Machines
LanguageEnglish

Related product manuals