Chapter 8 - Replacement Procedures 8-171
Section 8-56
Replacement of CWD piggy
8-56-1 Manpower
One person, 30 minutes.
8-56-2 Tools
Philips screwdriver, Hirose ejector
8-56-3 Preparations
Power Off/Shutdown the system as described in 4-3-2 on page 4-4.
8-56-4 Removal Procedure
1.) Unscrew 2 screws and remove POWER CORD FIX BRKT and power cord.
Figure 8-244 Power Bracket
POWER CORD FIX BRACKET
power cord

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Voluson P6 BT18 and is the answer not in the manual?

GE Voluson P6 BT18 Specifications

General IconGeneral
BrandGE
ModelVoluson P6 BT18
CategoryMedical Equipment
LanguageEnglish

Related product manuals