iManager NetEco 6000
Device Installation and Commissioning Guide
2 Installation Preparations
Copyright © Huawei Technologies Co., Ltd.
Huawei will not be liable for any consequence caused by the violation of this document.
The requirements are as follows:
Customers' installation personnel must be trained by Huawei and understand how to
install and operate a Smart Module.
The number of installation personnel varies depending on the project progress and the
installation environment. Typically, three to five persons are required.
2.3 Tools and Instruments
This section lists the tools and instruments required for installation.
Table 2-1 Common tools
Tool Name, Specifications, and Appearance
Flat-head
screwdriver (2–5
mm)
Socket wrench
M4/M6/M8/M12
Solid wrench
(12#/13#/18#)