iManager NetEco 6000
Device Installation and Commissioning Guide
Copyright © Huawei Technologies Co., Ltd.
6.4.1.5 Creating an ECC500 V6 Collector on the NetEco
Prerequisites
You have logged in to the NetEco client.
You have the operation rights for Data Center Planning.
You have created a management domain for the device to be added on the Data Center
Planning page.
Procedure
Step 1 Choose Configuration > Configuration Management > Data Center Planning from the
main menu. The Data Center Planning page is displayed.
Step 2 Select the management domain to add a device. The management domain can be a rack,
power cabinet, or DDF.
Step 3 Click the management domain and choose Design under the . The page for adding a device
is displayed.
Step 4 In the lower-left corner of the page, click the Device tab.
Step 5 Click the drop-down list box in Type and select Collector.
Step 6 Select Collector and drag the icon to the inside of the cabinet.
To delete a device, click the device and choose Delete under .
Step 7 Specify parameters in the right pane based on the following table. Figure 6-52 shows these
parameters.