Step 6 Set AI/DI_1 Power Supply to On.
Step 7 Click Submit.
----End
6.4.2.1.4 Creating an Icon for a Door Status Sensor on the NetEco
This section describes how to create and configure an icon for a door status sensor in an
equipment room or container.
Prerequisites
You have logged in to the NetEco client by web browser
You have the operation rights for configuring Data Center View.
Procedure
Step 1 Choose Monitor > Topo > Data Center View from the main menu. The Data Center View
window is displayed.
Step 2 In the 3D view editing window, click .The Toolbox dialog box is displayed.
Step 3 Drag to the required position in the view. The Property Panel dialog box is
displayed, as shown in Figure 6-59.
You can drag in the toolbox to create an icon for a door status sensor.