iManager NetEco 6000
Device Installation and Commissioning Guide
6 Adding Devices
Copyright © Huawei Technologies Co., Ltd.
197
Step 6 Set AI/DI_1 Power Supply to On.
Step 7 Click Submit.
----End
6.4.2.1.4 Creating an Icon for a Door Status Sensor on the NetEco
This section describes how to create and configure an icon for a door status sensor in an
equipment room or container.
Prerequisites
You have logged in to the NetEco client by web browser
You have the operation rights for configuring Data Center View.
Procedure
Step 1 Choose Monitor > Topo > Data Center View from the main menu. The Data Center View
window is displayed.
Step 2 In the 3D view editing window, click .The Toolbox dialog box is displayed.
Step 3 Drag to the required position in the view. The Property Panel dialog box is
displayed, as shown in Figure 6-59.
You can drag in the toolbox to create an icon for a door status sensor.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei iManager NetEco 6000 and is the answer not in the manual?

Huawei iManager NetEco 6000 Specifications

General IconGeneral
BrandHuawei
ModeliManager NetEco 6000
CategoryServer
LanguageEnglish

Related product manuals