CHAPTER 3A ENGINE 260/ 300 / 400 cc ATV SERVICE MANUAL09.0
CHAPTER 3 ENGINE PAGE. 3A- 44
PRIMARY SHEAVE REMOVAL
1. Remove:
zNut c(primary sheave)
zPlate washer
zPrimary fixed sheaved
NOTE:
Loosen the nut (primary fixed sheave) while
holding the primary fixed sheave with the rotor
holdere.
SECONDARY SHEAVE AND V-BELT
REMOVAL
1. Remove:
zNut c (secondary sheave)
zClutch housing d
NOTE:
Loosen the nut (secondary sheave) while
holding the clutch housing with the sheave
holdere.
2. Remove:
zNut c (clutch carrier)
CAUTION:
Do not remove the nut (clutch carrier) yet.
NOTE:
Loosen the nut (clutch carrier) one turn using
the locknut wrench e while holding the clutch
carrier with the rotor holderd.
3. Remove:
zClutch assembly c
zV-belt d
NOTE:
Remove the V-belt from the primary sheave side
with clutch assembly.