Appendix C _____________________________________________ Installation and Test Procedures
VAISALA______________________________________________________________________ 385
Test Passed
C.19 AFC Functional Test (Optional)
Test Goal
Verify that the AFC properly tracks the burst pulse frequency.
Special Test Equipment
- KVM connected
Reference
-See Section 5.4 Ps — Plot Burst Spectra and AFC on page 148
Test Procedure
1. Use the setup terminal to enter the Ps mode and observe the output on
a display scope.
2. Verify the following:
For Customer_________________________________ Date__________
For Vaisala___________________________________ Date__________
Verify the system is in AFC mode by checking that the text on the
terminal for the AFC % output says "AFC".
Verify the frequency displayed on the setup terminal is within
±15KHz of the center IF frequency (the default value for the AFC
hysteresis outer limit in the "Mb" command); for example, in the range
29.985 to 30.015 MHz. If it is not in this range, verify that it moves
within this range.
Turn radiate off for 10 minutes and then turn the radiate back on.
Observe to see if the AFC properly tracks the magnetron frequency as
the magnetron warms.
Similarly, set the control signal to the maximum and minimum values
using MFC, then turn on AFC. Observe to see if the AFC properly
tracks back to the correct frequency.
Perform the tests above for each pulse width and verify that the AFC
properly tracks the center frequency:
For pulse width 1.
For pulse width 2.
For pulse width 3.