$GYDQW
&RQWUROOHU8VHU¶V*XLGH
&KDSWHU &RQILJXUDWLRQ$SS OLFDWLRQ%XLOGLQJ
3-64 3BSE 002 415R701 Rev A
6,2
*HQHUDO7HFKQLFDO'DWD&DSDFLW\
Please note that you must consider practical limits when the data below is applied, for example:
• Space aspects
•CPU load
• Integrity aspects
• Availability aspects.
6,2
*HQHUDO7HFKQLFDO'DWD&DSDFLW\
Please note that you must consider practical limits when the data below is applied, for example:
• Space aspects
•CPU load
• Integrity aspects
• Availability aspects.
7DEOH &DSDFLW\6,2
'DWD 9DOXH
No. of buses max. 7
No. of I/O units per bus
(1)
(1) Including products like MasterPiece 51, TYRAK L, SAMI, etc.
max. 16
No. of DI signals
(2)
(2) This total includes S100 I/O signals, S400 I/O signals, S800 I/O signals
and calculated signals.
max. 2300
No. of DO signals
(2)
max. 1489
No. of AI signals
(2)
max. 910
No. of AO signals
(2)
max. 963
7DEOH &DSDFLW\6,2
'DWD 9DOXH
No. of AF100 buses max. 8
No. of I/O stations/bus max. 79/32
(1)
(2)
No. of I/O modules per station max. 24
No. of cluster per station 8
(3)