Advant
®
Controller 450 User’s Guide
Chapter 5 Maintenance
5-12 3BSE 002 415R701 Rev A
Reference in Advant Cont roller 400 Display:
Presentation:
Function:
Actions at fault:
Block Diagram:
Backup Pow. Supp. (1) 2
green Normal
red cr Fault
Supervision of the backup power supply of RAM
Plain System Message
at fault:
5
Software
DB; AC450
System status OS
Backup Pow. Supp.2
Hardware
BPS2_ERR
Y/N
BPS2
DIAGN.
SB522
SB510/511
POW SUPP ST Battery Charger faulty Net xx Nod yy
1. See Section 5.4.9.6, Check of Backup Power Supply
Reference in Advant Cont roller 400 Display:
Presentation:
Function:
Actions at fault:
Block Diagram:
Processor module L (R)
green filled Processor is primary
green empty Processor in backup mode
Supervision of redundant
1. Replace the pointed out processor module
Plain System Message
at fault:
6
yellow cr Processor is stopped
red cr Processor is erroneous
processor modules
Software
System status OS
Processor module L
Hardware
DIAGN.
PM511
Automatic
configured
DB; PM511
ERR
DEV ST
Error in CPU Net xx Nod yy
(only relevant when two redundant
processor modules are installed)
2. Fault finding in case of a single processor module or stop of both modules when redundant
processor modules are used is described in Section 5.4.9.6, Check of Backup Power Supply

Table of Contents

Other manuals for ABB Advant Controller 450

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB Advant Controller 450 and is the answer not in the manual?

ABB Advant Controller 450 Specifications

General IconGeneral
BrandABB
ModelAdvant Controller 450
CategoryController
LanguageEnglish

Related product manuals