DVP-ES3/EX3/SV3/SX3 Series Hardware and Operation Manual
D-2
D.1 Cautions
Observe the following precautions before performing maintenance and inspection. Incorrect or careless operation
will lead to injury or equipment damage.
To prevent a breakdown of a PLC Series system or a fire, ensure that the ambient environment does not
contain corrosive substances such as chloride gas, sulfide gas or flammable substances such as oil mist,
cutting powder, or dirt.
To prevent the connectors from oxidizing and to prevent electric shock, do not touch the connectors.
To prevent electric shock, turn off the power before pulling the connectors or loosening the screws.
To prevent cable damage, and to prevent the connectors from being loosened, do not put weight on the
cables or pull on them.
Ensure that the input voltage is within the rated range.
To prevent product breakdown, fire, or injury, do not disassemble or alter the modules.
To prevent a controlled element from malfunctioning, ensure that the program and parameters are written
into a new CPU module before restarting the PLC Series system.
To prevent incorrect output or equipment damage, refer to the related manuals for more information
about operating the modules.
To prevent damage to the modules, touch grounded metal or wear an antistatic wrist strap to release
static electricity from your body before working on a module.
To prevent noise from causing system breakdown, keep a proper distance from the system when using a
cell phone or communication device.
Do not install a PLC Series system in direct sun or in a humid environment.
To prevent the temperature of an element from being too high, maintain a proper distance between the
PLC Series system and heat sources such as coils, heating devices, and resistors.
To protect a PLC Series system, install an emergency stop switch and an overcurrent protection device.
Inserting and pulling a module several times can loosen the contact between the module and the
backplane.
To prevent an unexpected shock from resulting in damage to the PLC Series system and a controlled
element, ensure that the modules are correctly and firmly installed.