Requirements
The required software was installed on the PG/ PC or PCS 7 ES.
Procedure for conguring and assigning parameters
1. Start the SIMATIC Manager.
2. Congure the ET 200iSP with HW Cong.
– Create a new project
– Drag modules from the hardware catalog to the conguration table
3. Congure the time stamping (option).
4. Double-click the rst module of the ET 200iSP in the conguration table and set the
parameters.
5. Parameterize the other modules of the ET 200iSP.
6. Save the conguration or download the conguration (e.g. typically to the CPU 410-5H):
– Conguration with IM 152-1PN: In the IO controller
– Conguration with IM 152-1DP: In the DP master.
7.4 Project Engineering with GSD File and SIMATIC PDM
Integration of the station
The integration of the station into the automation system depends on the type of network used:
• When connected via PROFINET IO, the station is integrated as an IO device with an interface
module IM 152-1PN.
• When connected via PROFIBUS DP, the station is integrated as a DPV0/DPV1 device with an IM
152-1DP interface module.
Commissioning and Diagnostics
7.4 Project Engineering with GSD File and SIMATIC PDM
ET 200iSP
Operating Instructions, 11/2022, A5E00247483-AK 161