Master → Converter
The master transfers the data in the "Combined Transaction Type 2" (CTT2) to the converter
and writes it to r2050[1] and r2050[2].
To process these values in the converter, you must appropriately interconnect r2050[1] and
r2050[2] in the converter. This means, when the control sends the speed setpoint, you must
interconnect parameter p1070 (source for the main setpoint) with r2050 as follows:
p1070[0]=2050[1]
Note
Internal interconnection with Macro 34
If, when commissioning, you select Macro 34, then the main setpoint is internally
interconnected with r2050[1].
Once a setpoint has been transferred completely, the setpoint present in the control will
be transferred as next setpoint. Any setpoint changes made during the transfer are not
considered.
7.7.4.2 Acyclic communication - standard
This type of acyclical communication supports the ID read request and the diagnostic read
request. All other requests receive the "request not implemented" message response.
• ID request:
– Master → slave
– Slave → master
0DQXIDFWXUHUV,'
3URGXFW,'KH[ KH[%%KH[
• Diagnostic request:
– Master → slave
– Slave → master no error
Slave → master general error
The following response is issued for all other write or read requests:
• Read requests
• Write requests
7.7.4.3 Acyclic communication - manufacturer-specic
The manufacturer-specic acyclical communication is performed via data record 47 in PIV
format. The PIV (parameter channel) format structure is identical with that for the USS
parameter channel.
Advanced commissioning
7.7Drive control via AS-i
SINAMICS G115D Wall Mounted distributed drive
182 Operating Instructions, 07/2023, FW V4.7 SP14, A5E52808211A AA