MAINTENANCE
7--14 27080 Issue 1 Sept 98
Note: The following procedures must only be carried out by Domino
trained personnel.
9(a). Jet into Gutter Alignment
With the jet running, check the position that it enters the gutter as
shown in the following diagram. If incorrect, carry out the jet
alignment procedure on page 7--15.
Jet Alignment
in Charge
Electrode
Jet Alignment
with Deflector
Plates
Jet Alignment in Gutter
Jet
Head Alignments
Jet to be set 25% of
gutter diameter from
gutter wall
75%
ID
TP2145--1
1mm
1mm
90%
ID
Pinpoint
Pinpoint