EasyManuals Logo
Home>GE>Medical Equipment>LOGIQ P3 PRO

GE LOGIQ P3 PRO User Manual

GE LOGIQ P3 PRO
348 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #101 background imageLoading...
Page #101 background image
GE PROPRIETARY TO GE
D
IRECTION 5308917-100, REVISION 8 LOGIQ P3 SERVICE MANUAL
Chapter 4 Functional Checks 4-3
4-3-1-1 Boot Up (cont’d)
When power is applied to the scanner, power is distributed to the Cooling Unit, Control Panel, LCD,
Peripherals and the TMST.
4-3-1-2 Turn on the system
Press the Power On/Off switch at the front of the system once.
When the Power On/Off switch on the Control Panel is pressed once, the TMST starts and the software
code is distributed to initiate the scanner.
No status messages are displayed during this process.
4-3-2 Power Off/ Shutdown
NOTE: After turning off a system, wait for at least twenty seconds before turning it on again. The system may
not be able to boot if power is recycled too quickly.
4-3-2-1 TMST Power Down
To power down the system:
1.) Press the Power On/Off switch at the front of the system once.
2.) The System-Exit window is displayed.
3.) Using the Trackball or Select key, select Shutdown.
Figure 4-2 Power On/Off Switch
Figure 4-3 System Exit Window
Power On/Off switch

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ P3 PRO and is the answer not in the manual?

GE LOGIQ P3 PRO Specifications

General IconGeneral
BrandGE
ModelLOGIQ P3 PRO
CategoryMedical Equipment
LanguageEnglish

Related product manuals