GE PROPRIETARY TO GE
D
IRECTION 5308917-100, REVISION 8 LOGIQ P3 SERVICE MANUAL
8-98 Section 8-14 - Loading Software
4.) Call the Online Center (OLC).
Tell the OLC that you need a “Challenge Code”, and on request, you must read the challenge string on
the screen. OLC will return a password that you need to type in as the Response.
5.) Enter the Response (password) you received from OLC. The System Software loading from the
repository starts.
After the Software loading is complete, restore the Backed up Database.
8-14-0-3 Functional Checkout Procedure
8-14-1 For a service call with no fru replacement, use the following debrief script.
See
Section Functional Test Debrief Script
4-3-1 Power On/Boot Up
Service Manual Direction 5308917-100, Section 8-14-0. Equipment passes all
required tests and is ready for use.
4-3-2 Power Off/ Shutdown
4-3-6 B Mode Checks
4-3-7 M Mode Controls
4-3-8
Color Flow Mode
Checks
4-3-9
Doppler Mode
Checks
See
Section Functional Test Debrief Script
4-3-1 Power On/Boot Up
Service Manual Direction 5308917-100, Section 8-14-1. Equipment passes all
required tests and is ready for use.
4-3-2 Power Off/ Shutdown
4-3-6 B Mode Checks
4-3-7 M Mode Controls
4-3-8
Color Flow Mode
Checks
4-3-9
Doppler Mode
Checks