GE PROPRIETARY TO GE
D
IRECTION 5308917-100, REVISION 8 LOGIQ P3 SERVICE MANUAL
3-12 Section 3-5 - Completing the Installation
3-5-2-2 Back-end Processor Power Down - LOGIQ P3 BT10
To power down the system:
1.) Press the Power On/Off switch at the front of the system.
2.) Thew System-Exit window is displayed.
Figure 3-10 System Exit Window
3.) Using the Trackball or Select key, select Shutdown.
4.) The shutdown process takes a few seconds and is complete when the power status LED is turned
Amber color.
5.) Disconnect the probes. Clean or disinfect all probes as necessary. Store them in their shipping
cases to avoid damage.