GE PROPRIETARY TO GE
D
IRECTION 5308917-100, REVISION 8 LOGIQ P3 SERVICE MANUAL
Chapter 2 Pre Installation 2-1
Chapter 2
Pre Installation
Section 2-1
Overview
2-1-1 Purpose of this chapter 2
This chapter provides the information required to plan and prepare for the installation of a LOGIQ P3.
Included are descriptions of the facility and electrical needs to be met by the purchaser of the unit.
2-1-2 Chapter Contents
Table 2-1 Contents in Chapter 2
Section Description Page Number
2-1
Overview
2-1
2-2
General Console Requirements
2-2
2-3
Facility Needs
2-7