1
Rear of rail
2
Rack mounting rails
3
M6 screws
4
Latches
5
Front of rail
Note: You might find it helpful, with some types of racks, to remove the rack doors and side panels
to provide easier access during installation.
2. Check the labels on the support rails. Each rail has a label that indicates which is the front end of the
rail and whether the rail is for the left or right side of the rack. Perform this procedure for both rails.
3. Insert the right slide rail
2
into the rear rack mounting flange, as shown in Figure 57, with the rail
pins
1
protruding through the flange.
4. Extend the right slide rail
2
and insert it into the front rack mounting flange, as shown in Figure 58
on page 74, with the rail pins
1
protruding through the flange. Insert the left slide rail in the same
way.
Figure 56. SAN Volume Controller 2145-8G4 support rails installation kit
2
svc00240
Figure 57. Inserting the right slide rail into the rear rack mounting flange
Chapter 2. Removing and replacing parts 73

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM SAN Volume Controller 2145-CG8 and is the answer not in the manual?

IBM SAN Volume Controller 2145-CG8 Specifications

General IconGeneral
BrandIBM
ModelSAN Volume Controller 2145-CG8
CategoryStorage
LanguageEnglish

Related product manuals