User manual of EC160 elevator intelligent integrated machine Complete product description
182
and so on;
2. All CL2 and CH2 of MC-GCL are in parallel connection;
3. The total number of MC-GCL is no more than 8;
4. Short circuit all J2 of MC-GCL; short circuit J3 between No.1 and No. n elevator while disconnect
J3 pins in other elevators;
5. No.1 elevator: MC-GCL is connected to EC160 (group number L0=3), No.2 elevator: MC-GCL is
connected to EC160 (group number L0=4), and so on…No.8 elevator: MC-GCL is connected to
EC160 (group number L0=10).
9.4.9 Debugging
9.4.9.1 Connection between MC-GCL and manual controller
Figure 9-10 Connection of MC-GCL and manual controller
9.4.9.2 Initial debugging interface
【monitoring
password input】
00000000
【main menu】
A system control
B fault record
C language selection
D parameters setting
inquiry
E password setting
F system autotuning
G data management
H system information
USB
cable