SETTINGS AND PROCEDURES BEFORE OPERATION
5.3 Settings and Procedures before Operation
5 - 17
1
OVERVIEW
2
SYSTEM
CONFIGURATION
3
SPECIFICATIONS
4
FUNCTIONS
5
SETTING AND
PROCEDURES
6
I/O NUMBER
ASSIGNMENT
7
MEMORIES AND
FILES
8
INSTALLING /
UNINSTALLING
(5) When making microcomputer connection with GOT
POINT
Refer to the following manual for the commands that can be used for data
transmission to the GOT in microcomputer connection.
GOT Manual
Figure 5.15 Configuration of microcomputer connection with GOT
Figure 5.16 Flowchart for microcomputer connection with GOT
C Controller module
Development environment (PC)
Ethernet
RS-232
GOT
Procedures for operation
Start up the C Controller module.
Set parameters, referring to (2) for a single CPU
system, or the flowchart in Section 17.1 for a multiple
CPU system.
Operation
Create and debug a user program using Tornado, and
register it to the C Controller module.
Connect the GOT to CH2 (RS-232 interface) of the C
Controller module by a cable.
On the GOT, make various settings and create screen
programs.
GOT Manual
This section (2) or
Section 16.1
GOT Manual
This section (1)
Chapter 10
This section (2) or
Section 17.1

Table of Contents

Other manuals for Mitsubishi MELSEC Q Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Mitsubishi MELSEC Q Series and is the answer not in the manual?

Mitsubishi MELSEC Q Series Specifications

General IconGeneral
BrandMitsubishi
ModelMELSEC Q Series
CategoryController
LanguageEnglish

Related product manuals