9 - 70
9.3 CC-Link utility
9.3.4 Operating Online operation screen
9
UTILITY OPERATION
9.3.4 Operating Online operation screen
The CC-Link parameters can be read, written or verified from this screen.
POINT
1. If a communication error has occurred during connection, make the
connection target setting again.
2. Communication are not available during reset of the C Controller module.
Start communication after terminating the reset process.
Figure 9.56 Online operation screen