GE H
EALTHCARE
D
IRECTION
53
94152,
Revision 5
LOGIQ™ P6/P6 P
RO
S
ERVICE
M
ANUAL
Page 4-32
Section 4-8 - Mechanical Function Checks
4-8-2
Air filter set Func
tion Validation Procedure
Check if the
air filter is pla
ced deep insid
e.
Figure 4-30 Air Filter Set
117
119
Table of Contents
GE Healthcare
1
Important Precautions
19
Revision History
28
Chapter 1
29
Introduction
29
Section 1-1 Overview
29
1-1-1 Purpose of Chapter 1
29
1-1-2 Purpose of Service Manual
29
1-1-3 Typical Users of the Basic Service Manual
30
1-1-4 LOGIQ™ P6/P6 Pro Models Covered by this Manual
30
1-1-5 Purpose of Operator Manual(s)
30
Section 1-2 Important Conventions
31
1-2-1 Conventions Used in Book
31
1-2-2 Standard Hazard Icons
32
1-2-3 Product Icons
33
1-2-4 WEEE Label
35
Section 1-3 Safety Considerations
40
1-3-1 Introduction
40
1-3-2 Human Safety
40
1-3-3 Mechanical Safety
40
1-3-4 Electrical Safety
41
1-3-5 Label Locations
42
1-3-6 Dangerous Procedure Warnings
44
1-3-7 Lockout/Tagout Requirements (For USA Only)
44
Section 1-4 EMC, EMI, and ESD
45
1-4-1 Electromagnetic Compatibility (EMC)
45
1-4-2 CE Compliance
45
1-4-3 Electrostatic Discharge (ESD) Prevention
45
Section 1-5 Customer Assistance
46
1-5-1 Contact Information
46
1-5-2 System Manufacturer
47
Chapter 2
49
Pre-Installation
49
Section 2-1 Overview
49
2-1-1 Purpose of chapter 2
49
Section 2-2 General Console Requirements
50
2-2-1 Console Environmental Requirements
50
2-2-1-1 Cooling
50
2-2-1-2 Lighting
50
2-2-2 Electrical Requirements
51
2-2-2-1 LOGIQ™ P6/P6 Pro Power Requirements
51
2-2-2-2 Inrush Current
51
2-2-2-3 Site Circuit Breaker
51
2-2-2-4 Site Power Outlets
52
2-2-2-5 Unit Power Plug
52
2-2-2-6 Power Stability Requirements
52
2-2-3 EMI Limitations
53
2-2-4 Scan Probe Environmental Requirements
54
Section 2-3 Facility Needs
55
2-3-1 Purchaser Responsibilities
55
2-3-2 Required Features
56
2-3-3 Desirable Features
57
2-3-4 Recommended and Alternate Ultrasound Room Layout
58
2-3-5 Networking Pre-installation Requirements
59
2-3-5-1 Purpose of DICOM Network Function
59
2-3-5-2 DICOM Option Pre-installation Requirements
59
Chapter 3
61
Installation
61
Section 3-1 Overview
61
3-1-1 Purpose of Chapter 3
61
Section 3-2 Installation Reminders
62
3-2-1 Average Installation Time
62
3-2-2 Installation Warnings
62
3-2-3 Safety Reminders
63
Section 3-3 Receiving and Unpacking the Equipment
64
3-3-1 Moving into Position
69
3-3-2 Adjusting System Clock
69
3-3-3 Product Locator Installation Card
69
Section 3-4 Preparing for Installation
70
3-4-1 Verify Customer Order
70
3-4-2 Physical Inspection
70
3-4-2-1 System Voltage Settings
70
3-4-2-2 Video Formats
70
3-4-3 EMI Protection
70
Section 3-5 Completing the Installation
71
3-5-1 Power On/Boot Up
71
3-5-1-1 Scanner Power On
71
3-5-1-2 Power Up Sequence
72
3-5-1-3 Power Up Sequence
73
3-5-2 Power Off/ Shutdown
73
3-5-2-1 Power Shutdown
73
3-5-3 Transducer Connection
74
Section 3-6 System Configuration
75
3-6-1 System Specifications
75
3-6-1-1 System Settings
75
3-6-1-2 Physical Dimensions
76
3-6-1-3 Weight without Monitor and Peripherals
77
3-6-1-4 Acoustic Noise Output:
77
3-6-2 Electrical Specifications
77
3-6-3 On-Board Optional Peripherals
77
3-6-4 External I/O Connector Panel
78
3-6-4-1 External I/O Pin Outs
79
3-6-5 Video Specification
80
3-6-6 Setting VCR (Mitsubishi MD3000) USB Interface
81
Section 3-7 Available Probes
82
Section 3-8 Software/Option Configuration
82
Section 3-9 Connectivity Installation Worksheet
83
Section 3-10 Insite IP Address Configuration
84
Section 3-11 Loading Base System Software
84
3-11-1 Loading Base system Software
84
Section 3-12 Warnings
84
3-12-1 Warnings
84
3-12-1-1 USB HDD
84
3-12-1-2 Starting Echoloader in Maintenance mode
84
Section 3-13 Paperwork
85
3-13-1 Product Locator Installation
85
3-13-2 User Manual(s)
85
3-13-2-1 Reference off-board peripherals and options
85
Chapter 4
87
Functional Checks
87
Section 4-1 Overview
87
4-1-1 Purpose of Chapter 4
87
Section 4-2 Required Equipment
87
Section 4-3 General Procedure
88
4-3-1 Power On/Boot Up
88
4-3-1-1 Scanner Power On
88
4-3-2 Power Off / Shutdown
90
4-3-2-1 Scanner Shutdown
90
4-3-2-2 Switch off the System
90
4-3-3 System Features
91
4-3-3-1 Control Panel for LOGIQ™ P6/P6 Pro
91
4-3-3-2 Monitor Display for LOGIQ™ P6/P6 Pro
92
4-3-4 System B/M-Mode Checks
93
4-3-5 System CFM and PWD Checks
94
4-3-6 Basic Measurements
95
4-3-6-1 Distance and Tissue Depth Measurements
95
4-3-6-2 Circumference/Area (Ellipse) Measurement
95
4-3-6-3 Worksheets
96
4-3-7 Probe/Connectors Usage
96
4-3-7-1 Connecting a probe
96
4-3-7-2 Activating the probe
96
4-3-7-3 Deactivating the probe
96
4-3-7-4 Disconnecting the probe
96
4-3-8 Using Cine
97
4-3-8-1 Activating CINE
97
4-3-8-2 Quickly Move to Start/End Frame
97
4-3-8-3 Start Frame/End Frame
97
4-3-8-4 Adjusting the CINE Loop Playback Speed
97
4-3-8-5 Disconnecting B-Mode CINE from Timeline CINE
97
4-3-8-6 Moving through a CINE Loop Frame By Frame
97
4-3-9 Image Management (QG)
97
4-3-10 Using the DVD-R
98
4-3-10-1 Using the DVD-R
98
4-3-11 Backup and Restore Database, Preset Configurations and Images
102
4-3-11-1 Formatting Media
102
4-3-11-2 Backup System Presets and Configurations
104
4-3-11-3 Restore System Presets and Configurations
105
4-3-11-4 Archiving Images
106
4-3-12 ECG Check Out
108
Section 4-4 Software Configuration Checks
108
Section 4-5 Peripheral Checks
109
Section 4-6 Monitor Function Checks
110
4-6-1 17" LCDMON II Assy & LCD Panel with filter Function Validation Procedure
110
4-6-2 17" OSD Key Assy Function Validation Procedure
111
Section 4-7 Keyboard Function Checks
112
4-7-1 Main Keyboard Assy Function Validation Procedure
112
4-7-2 Sub Keyboard Assy Function Validation Procedure
115
4-7-3 Trackball Assy validation
115
4-7-4 A/N Key assy validation
115
4-7-5 Freeze key validation
115
4-7-6 TGC key assy / TGC Knob Set validation
116
4-7-7 Sub Keyboard Encoder Knob Set validation
116
Section 4-8 Mechanical Function Checks
117
4-8-1 Cover Parts Function Validation
117
4-8-2 Air filter set Function Validation Procedure
118
4-8-3 TGC key assy/TGC Knob set, Sub keyboard encoder Knob Set, keycap set, Main keyboard Encoder Knob set Function Validation Procedure
119
4-8-4 Cup holder Function Validation Procedure
120
4-8-5 Front caster/Rear caster Function Validation Procedure
121
4-8-6 New articulation arm with cover Function Validation Procedure
122
Section 4-9 Board Function Checks
123
4-9-1 PI128II Assy function check procedure
123
4-9-2 DTRX64II Assy Function Validation Procedure
125
4-9-3 Probe Assessment Diagnostic Test Validation Procedure
126
4-9-4 CWD64 Assy Function Validation Procedure
128
4-9-5 SYSCONML Assy Function Validation Procedure
131
4-9-5-1 L2SYSCON diagnostic Test
131
4-9-5-2 Peripheral Test
131
4-9-6 APS II Assy PCB Function Validation Procedure
132
4-9-7 SOM Function Validation Procedure
133
4-9-8 RFC Assy Function Validation Procedure
133
4-9-9 BP128 Assy Function Validation Procedure
134
4-9-10 Nest fan Function Validation Procedure
135
4-9-11 Transbox/ Fan Function Validation Procedure
135
4-9-12 DTRX Cooler with heatsink Function Validation Procedure
136
4-9-13 ACPC II Assy set Function Validation Procedure
136
4-9-14 AP950 Transbox Assy Function Validation Procedure
136
4-9-15 Fuse set Function Validation Procedure
136
4-9-16 ARPII Assy Function Validation Procedure
136
Section 4-10 Site Log
137
Chapter 5
139
Components and Functions (Theory)
139
Section 5-1 Overview
139
Section 5-2 Block Diagrams and Theory
140
5-2-1 LOGIQ™ P6/P6 Pro Block Diagram
140
Section 5-3 Power Diagrams
147
5-3-1 Overview
147
5-3-2 TRANSBOX(AC Power, AP950)
147
5-3-3 APS II (LV Power & HV Power)
148
5-3-4 AC Power Outlet for Peripheral
149
5-3-4-1 Safety
149
5-3-5 Front End
149
5-3-6 SYSCONML
150
Section 5-4 Top Console
151
5-4-1 Keyboard
151
5-4-1-1 KEYBOARD Signal I/O
152
5-4-2 LOGIQ™ P6/P6 Pro Monitor
153
5-4-2-1 MONITOR Signal I/O
153
5-4-2-2 LOGIQ™ P6/P6 Pro LCDMON control button function
154
Section 5-5 P6 ARP II (Rear Panel)
155
5-5-1 Input/Output Signals for peripheral
156
Section 5-6 Cable Connection
157
5-6-1 Overview
157
5-6-2 Internal Cable
157
5-6-3 Peripherals connection
158
5-6-3-1 BW and Color printers
158
5-6-3-2 DVD Recorder
159
5-6-4 Filters
159
5-6-5 Fans
160
Section 5-7 Service Platform
161
5-7-1 Introduction
161
5-7-2 Global Service User Interface (GSUI)
162
5-7-2-1 Internationalization
162
5-7-2-2 Service Login
162
5-7-2-3 Access / Security
162
5-7-3 Global Service User Interface (GSUI)
163
5-7-3-1 Internationalization
163
5-7-3-2 Service Login
163
5-7-3-3 Access / Security
163
5-7-4 Service Home Page
164
5-7-5 Error Logs Tab
165
5-7-5-1 Logs
166
5-7-5-2 Exit
166
5-7-6 Diagnostics
167
5-7-6-1 Diagnostics Execution
167
5-7-6-2 Diagnostic Reports
167
5-7-6-3 Proactive Diagnostics
167
5-7-7 Image Quality
168
5-7-8 Calibration
168
5-7-9 Configuration
169
5-7-9-1 Questra Agent Configuration
169
5-7-9-1-1 Device Information
169
5-7-9-1-2 Advanced Configuration
169
5-7-9-1-3 Proxy Configuration.
170
5-7-10 Utilities
170
5-7-11 Replacement
171
5-7-12 PM
171
5-7-13 Remote Software/Option Installation and Updates
172
5-7-13-1 Remote System Shutdown and Restart
172
5-7-13-2 File and/or Image Transfer
172
Section 5-8 RFS (Service For Request)
173
5-8-1 General
173
5-8-2 System Checkout Procedure
173
5-8-3 Sending RFS Procedure
176
Section 5-9 Machine RFS
178
5-9-1 General
178
5-9-2 Enabling MRFS
178
Section 5-10 Fast Polling
180
5-10-1 General
180
5-10-2 Enabling Fast Polling
180
Chapter 6
181
Service Adjustments
181
Section 6-1 Overview
181
6-1-1 Purpose of this chapter 6
181
Section 6-2 Regulatory
181
Section 6-3 Monitor Adjustments
182
6-3-1 Brightness and Contrast
182
6-3-2 Monitor Arm Locking
183
Section 6-4 Trackball Cleaning
184
Chapter 7
185
Diagnostics/Troubleshooting
185
Section 7-1 Overview
185
7-1-1 Purpose of Chapter 7
185
Section 7-2 Gathering Trouble Data
186
7-2-1 Overview
186
7-2-2 Collect Vital System Information
186
7-2-3 Collect a Trouble Image with Logs
187
Section 7-3 Screen Captures
188
7-3-1 Check and Record the P2 Key Function
188
7-3-2 Setting the P2 Key to Screen Capture
189
7-3-3 Capturing a Screen
190
7-3-4 Reset the P2 Key to Customer’s Functionality
191
Section 7-4 Diagnostics
192
Section 7-5 Screen Captures
193
7-5-1 Check and Record the P2 Key Function
193
7-5-2 Setting the P2 Key to Screen Capture
194
7-5-3 Capturing a Screen
195
7-5-4 Reset the P2 Key to Customer’s Functionality
196
Section 7-6 Diagnostics
197
Section 7-7 Common Diagnostics
198
7-7-1 Utilities
198
7-7-1-1 Disruptive Mode
198
7-7-1-2 System Shutdown
198
7-7-2 PC Diagnostics (Non-Interactive Tests)
199
7-7-2-1 CPU Tests
199
7-7-2-2 Hard Drive Tests
200
7-7-2-3 Memory Tests
200
7-7-2-4 CD/DVD Drive Test
201
7-7-2-5 Video Test
201
7-7-2-6 USB Test (Not yet supported)
202
7-7-2-7 PCI Board Configuration Test
202
7-7-2-8 Network Test
202
7-7-3 PC Diagnostics (Interactive Tests)
203
7-7-3-1 Keyboard Test
203
7-7-3-2 Audio Test
203
7-7-3-3 Monitor Test
203
7-7-4 FRU Test
204
7-7-4-1 SYSCONML
204
7-7-4-2 DTRX64II
205
7-7-4-3 PI128 II (LOGIQ™ P6/P6 Pro)
206
7-7-4-4 CWD64 (LOGIQ™ P6/P6 Pro)
206
7-7-4-5 P3RLY (LOGIQ™ P6/P6 Pro PRO)
207
7-7-4-6 ACWD (LOGIQ™ P6/P6 Pro PRO)
207
7-7-4-7 APS II
208
7-7-4-8 Keyboard
208
Section 7-8 LED Descriptions
209
7-8-1 DTRX64II Assy
209
7-8-2 PI128 II Assy (LOGIQ™ P6/P6 Pro)
209
7-8-3 P3RLY Assy (LOGIQ™ P6/P6 Pro)
209
7-8-4 SYSCONML Assy
209
7-8-5 APS II Assy
210
Section 7-9 Trouble Shooting Tree
211
7-9-1 System Does Not Power On / Boot Up
211
7-9-2 System Does Not Boot
212
7-9-3 System Does Not Boot
213
7-9-4 Noise in Image
215
7-9-5 Unable to Scan
216
7-9-6 Trackball
217
7-9-7 Monitor Troubleshooting
218
7-9-8 Unable to Record to VCR
220
7-9-9 Printer Troubleshooting
221
7-9-10 DVD-RW Troubleshooting
223
7-9-11 Network Troubleshooting
224
7-9-11-1 No Connection to the Network at All
224
7-9-11-2 No Contact With Server, But Connection to Network is OK
224
Chapter 8
227
Replacement Procedures
227
Section 8-1 Overview
227
8-1-1 Purpose of Chapter 8
227
Section 8-2 DISASSEMBLY/RE-ASSEMBLY
228
8-2-1 17 Inch monitor cover set
229
8-2-1-1 Tools
229
8-2-1-2 Removal procedure
229
8-2-1-3 Mounting Procedure
232
8-2-2 OSD button
233
8-2-2-1 Tools
233
8-2-2-2 Preparation
233
8-2-2-3 17" LCDMON OSD Key Assy Replace Procedure
233
8-2-2-4 Mounting Procedure
235
8-2-3 17 INCH LCDMON ASSY
236
8-2-3-1 Tools
236
8-2-3-2 Preparation
236
8-2-3-3 17" LCDMON ASSY Replace Procedure
236
8-2-3-4 Mounting Procedure
237
8-2-4 New Articulation arm with cover installation Procedure
238
8-2-4-1 Tools
238
8-2-4-2 Preparations
238
8-2-4-3 Removal procedure
238
8-2-4-4 Assembly procedure
247
8-2-5 New Articulation cover set installation Procedure
259
8-2-5-1 Tools
259
8-2-5-2 Preparations
259
8-2-5-3 Removal procedure
259
8-2-5-4 Mounting procedure
262
8-2-6 Main Keyboard Assy
263
8-2-6-1 Tools
263
8-2-6-2 Preparations
263
8-2-6-3 Removal procedure
263
8-2-6-4 Mounting Procedure
264
8-2-7 Sub Keyboard Assy
265
8-2-7-1 Tools
265
8-2-7-2 Preparations
265
8-2-7-3 Removal procedure
265
8-2-7-4 Mounting Procedure
265
8-2-8 Trackball Assy
266
8-2-8-1 Tools
266
8-2-8-2 Preparations
266
8-2-8-3 Removal procedure
266
8-2-8-4 Mounting Procedure
266
8-2-9 English, Greek, Russian, Swedish, Norwegian A/N Key assy
267
8-2-9-1 Tools
267
8-2-9-2 Preparations
267
8-2-9-3 Removal procedure
267
8-2-9-4 Mounting Procedure
268
8-2-10 Freeze key assy
269
8-2-10-1 Tools
269
8-2-10-2 Preparations
269
8-2-10-3 Removal procedure
269
8-2-10-4 Mounting Procedure
269
8-2-11 TGC key assy / TGC Knob Set
270
8-2-11-1 Tools
270
8-2-11-2 Preparations
270
8-2-11-3 Removal procedure
270
8-2-11-4 Mounting Procedure
271
8-2-12 Sub Keyboard Encoder Knob Set
272
8-2-12-1 Tools
272
8-2-12-2 Preparations
272
8-2-12-3 Removal procedure
272
8-2-12-4 Mounting Procedure
272
8-2-13 Keycap set, Main Keyboard Encoder Knob set
273
8-2-13-1 Tools
273
8-2-13-2 Preparations
273
8-2-13-3 Removal procedure
273
8-2-13-4 Mounting Procedure
273
8-2-14 Right or Left Side Cover
274
8-2-14-1 Tools
274
8-2-14-2 Preparations
274
8-2-14-3 Removal procedure
274
8-2-14-4 Mounting Procedure
275
8-2-15 Front Cover
276
8-2-15-1 Tools
276
8-2-15-2 Preparations
276
8-2-15-3 Removal procedure
276
8-2-15-4 Mounting Procedure
277
8-2-16 Rear Cover
278
8-2-16-1 Tools
278
8-2-16-2 Preparations
278
8-2-16-3 Removal procedure
278
8-2-16-4 Mounting Procedure
278
8-2-17 Middle Cover
279
8-2-17-1 Tools
279
8-2-17-2 Preparations
279
8-2-17-3 Removal procedure
279
8-2-17-4 Mounting Procedure
279
8-2-18 Top Cover
280
8-2-18-1 Tools
280
8-2-18-2 Preparations
280
8-2-18-3 Removal procedure
280
8-2-18-4 Mounting Procedure
280
8-2-19 Top Bottom Cover
281
8-2-19-1 Tools
281
8-2-19-2 Preparations
281
8-2-19-3 Removal procedure
281
8-2-19-4 Mounting Procedure
281
8-2-20 Pole Cover
282
8-2-20-1 Tools
282
8-2-20-2 Preparations
282
8-2-20-3 Removal procedure
282
8-2-20-4 Mounting Procedure
282
8-2-21 Neck Front
283
8-2-21-1 Tools
283
8-2-21-2 Preparations
283
8-2-21-3 Removal procedure
283
8-2-21-4 Mounting Procedure
284
8-2-22 Neck Rear
285
8-2-22-1 Tools
285
8-2-22-2 Preparations
285
8-2-22-3 Removal procedure
285
8-2-22-4 Mounting Procedure
286
8-2-23 Dummy Cover L / R
287
8-2-23-1 Tools
287
8-2-23-2 Preparations
287
8-2-23-3 Removal procedure
287
8-2-23-4 Mounting Procedure
288
8-2-24 EMI Cover L and R
289
8-2-24-1 Tools
289
8-2-24-2 Preparations
289
8-2-24-3 Removal procedure
289
8-2-24-4 Mounting Procedure
289
8-2-25 APS II Assy
290
8-2-25-1 Tools
290
8-2-25-2 Preparations
290
8-2-25-3 Removal procedure
290
8-2-25-4 Mounting Procedure
291
8-2-26 DTRX64II Assy
292
8-2-26-1 Tools
292
8-2-26-2 Preparations
292
8-2-26-3 Removal procedure
292
8-2-26-4 Mounting Procedure
293
8-2-27 P3RLY/PI128II Assy
294
8-2-27-1 Tools
294
8-2-27-2 Preparations
294
8-2-27-3 Removal procedure
294
8-2-27-4 Mounting Procedure
295
8-2-28 BP128 Assy
296
8-2-28-1 Tools
296
8-2-28-2 Preparations
296
8-2-28-3 Removal procedure
296
8-2-28-4 Mounting Procedure
297
8-2-29 CWD64 Assy
298
8-2-29-1 Tools
298
8-2-29-2 Preparations
298
8-2-29-3 Removal procedure
298
8-2-29-4 Mounting Procedure
298
8-2-30 SYSCONML Assy
299
8-2-30-1 Tools
299
8-2-30-2 Preparations
299
8-2-30-3 Removal procedure
299
8-2-30-4 Mounting Procedure
301
8-2-31 SOM Replacement
302
8-2-31-1 Tools
302
8-2-31-2 Preparations
302
8-2-31-3 Removal procedure
302
8-2-31-4 Mounting Procedure
303
8-2-32 RFC Assy
304
8-2-32-1 Tools
304
8-2-32-2 Preparations
304
8-2-32-3 Removal procedure
304
8-2-32-4 Mounting Procedure
304
8-2-33 Front Caster / Rear Caster
305
8-2-33-1 Tools
305
8-2-33-2 Preparations
305
8-2-33-3 Removal procedure
305
8-2-33-4 Mounting Procedure
306
8-2-34 Rear Handle
307
8-2-34-1 Tools
307
8-2-34-2 Preparations
307
8-2-34-3 Removal procedure
307
8-2-34-4 Mounting Procedure
307
8-2-35 Rear Hook
308
8-2-35-1 Tools
308
8-2-35-2 Preparations
308
8-2-35-3 Removal procedure
308
8-2-35-4 Mounting Procedure
308
8-2-36 Probe Holder
309
8-2-36-1 Tools
309
8-2-36-2 Removal procedure
309
8-2-36-3 Mounting Procedure
309
8-2-37 Cup Holder
310
8-2-37-1 Tools
310
8-2-37-2 Removal procedure
310
8-2-37-3 Mounting Procedure
310
8-2-38 ECG Cable Hook
311
8-2-38-1 Tools
311
8-2-38-2 Removal procedure
311
8-2-38-3 Mounting Procedure
311
8-2-39 Air Filter Set
312
8-2-39-1 Tools
312
8-2-39-2 Preparations
312
8-2-39-3 Removal procedure
312
8-2-39-4 Mounting Procedure
312
8-2-40 DVD R/W Drive
313
8-2-40-1 Tools
313
8-2-40-2 Preparations
313
8-2-40-3 Removal procedure
313
8-2-40-4 Mounting Procedure
314
8-2-41 NEST FAN Assy
315
8-2-41-1 Tools
315
8-2-41-2 Preparations
315
8-2-41-3 Removal procedure
315
8-2-41-4 Mounting Procedure
316
8-2-42 ARP II Assy 110V/220V
317
8-2-42-1 Tools
317
8-2-42-2 Preparations
317
8-2-42-3 Removal procedure
317
8-2-42-4 Mounting Procedure
318
8-2-43 SATA HDD Assy
319
8-2-43-1 Tools
319
8-2-43-2 Preparations
319
8-2-43-3 Removal procedure
319
8-2-43-4 Mounting Procedure
320
8-2-44 ACPC II Assy
321
8-2-44-1 Tools
321
8-2-44-2 Preparations
321
8-2-44-3 Removal procedure
321
8-2-44-4 Mounting Procedure
322
8-2-45 AP950 Assy
323
8-2-45-1 Tools
323
8-2-45-2 Preparations
323
8-2-45-3 Removal procedure
323
8-2-45-4 Mounting Procedure
325
8-2-46 Fuse Set
326
8-2-46-1 Tools
326
8-2-46-2 Preparations
326
8-2-46-3 Removal procedure
326
8-2-46-4 Mounting Procedure
326
8-2-47 Read and Write Serial Info
327
8-2-47-1 How to start serial no read/write program
327
8-2-47-2 How to read Serial No
329
8-2-47-3 How to write info on the system
329
Section 8-3 Software Loading Procedure
330
8-3-1 General
330
8-3-2 Parts Required
330
8-3-3 TimeRequired
330
8-3-4 Software Loading Steering Guide
331
8-3-5 Before Starting Software Loading
332
8-3-5-1 Saving Connectivity
332
8-3-5-2 Image Management Guide
333
Section 8-4 Software Installation
337
8-4-1 Installing Base Image Software
337
8-4-2 Verifying Base Image Software
342
8-4-2-1 Partition Checks
342
8-4-2-2 Driver Checks
344
8-4-2-3 USB Printer Checks (USB Printer User Only)
345
8-4-2-4 DMC Checks (DMC User Only)
347
8-4-3 Installing Application Software
348
8-4-4 Standard Confirmation & Functional Checks
351
8-4-4-1 Confirming software version
351
8-4-4-2 Setting Computer Name
352
8-4-4-3 Setting Printer Preferences
353
8-4-4-4 Functional Checks for Service Platform (Diagnostic Program)
356
8-4-4-5 Setting the VCR (if necessary)
358
8-4-4-6 Verifying the VCR (if necessary)
359
8-4-4-7 Setting Printer Properties in Application Software (if necessary)
360
8-4-4-8 Print Key Assignment and Checkouts necessary)
361
8-4-4-9 Regional Setup Procedure for Japanese
362
8-4-4-10 Product Type Check of the System
364
Section 8-5 Full Backup / Restore Procedure
365
8-5-1 General
365
8-5-2 Parts Required
365
8-5-3 Full Backup Procedure
365
8-5-4 Restore procedure
368
Section 8-6 Software Reloading
369
8-6-1 General
369
8-6-2 Software Reloading Procedure
369
8-6-2-1 Perform Software Reloading in the Service Platform
369
8-6-2-2 Software Reloading
375
Section 8-7 Mechanical Option Installation instruction
379
8-7-1 Endo Probe Holder Installation
380
8-7-2 Microphone Option fixture Installation
381
8-7-3 BT11 BW Printer Option Installation
382
8-7-4 Drawer Option installation
384
8-7-5 Cable Arm Hook installation
385
8-7-6 BW Printer Fixture Keyboard installation
386
8-7-7 BW printer Fixture Middle installation
389
8-7-8 Color Printer Fixture Middle installation - UP23MD Printer
391
8-7-9 Color Printer Fixture Middle installation - UP-D25MD Printer
393
8-7-10 Printer VCR DVD Fixture Top installation - UP23MD Printer
395
8-7-11 Color Printer Fixture Top Installation - UP-D25MD Printer
397
8-7-12 Printer VCR DVD fixture Top installation - CP900 Printer
400
8-7-13 Printer VCR DVD Fixture Top Installation (MD-3000)
403
8-7-13-1 VCR Remote Port Configuration
403
8-7-13-2 Bracket Installation
405
8-7-14 Printer VCR DVD Fixture Top Installation (MD-800)
408
8-7-15 Rear Handle installation
411
8-7-16 Additional Task Lamp installation
413
8-7-17 Protect Cover Installation
415
8-7-18 BT11 Drawer Option Installation
416
8-7-19 MTZ PROBE HOLDER Installation
419
8-7-20 DVR Fixture Top Installation - SONY DVO-1000MD DVD Recorder
420
Section 8-8 PHI(Protecting Health Information) DATA COMMUNICATION
423
8-8-1 Prevent exporting patient data to removable
423
8-8-2 ENCRYPTION PROCEDURE
424
Chapter 9
429
Renewal Parts
429
Section 9-1 Overview
429
9-1-1 Purpose of Chapter 9
429
Section 9-2 List of Abbreviations
430
Section 9-3 MONITOR
431
Section 9-4 KEYBOARD
433
Section 9-5 COVERS
435
Section 9-6 NEST
437
Section 9-7 BODY
439
Section 9-8 POWER
441
Section 9-9 Cables
443
Section 9-10 Options
447
Section 9-11 Software
448
Section 9-12 Probes
449
Section 9-13 Peripherals
450
Chapter 10
451
Care & Maintenance
451
Section 10-1 Overview
451
10-1-1 Periodic Maintenance Inspections
451
10-1-2 Purpose of Chapter 10
451
Section 10-2 Why do Maintenance
452
10-2-1 Keeping Records
452
10-2-2 Quality Assurance
452
Section 10-3 Maintenance Task Schedule
452
10-3-1 How often should care & maintenance tasks be performed?
452
Section 10-4 Tools Required
454
10-4-1 Standard GE Tool Kit
454
10-4-2 Special Tools, Supplies and Equipment
456
10-4-2-1 Specific Requirements for Care & Maintenance
456
Section 10-5 System Maintenance
457
10-5-1 Preliminary Checks
457
10-5-2 Functional Checks (See Also Chapter 4)
458
10-5-2-1 System Checks
458
10-5-2-2 Peripheral/Option Checks
459
10-5-3 Input Power
459
10-5-3-1 Mains Cable Inspection
459
10-5-4 Cleaning
459
10-5-4-1 General Cleaning
459
10-5-4-2 Air Filter Cleaning
460
10-5-5 Physical Inspection
460
10-5-6 Optional Diagnostic Checks
461
10-5-6-1 View the Logs
461
10-5-7 Probe Maintenance
461
10-5-7-1 Probe Related Checks
461
10-5-7-2 Basic Probe Care
461
10-5-7-3 Basic Probe Cleaning
461
Section 10-6 Electrical Safety Tests
462
10-6-1 Safety Test Overview
462
10-6-2 GEMS Leakage Current Limits
463
10-6-3 Outlet Test - Wiring Arrangement - USA & Canada
464
10-6-4 Grounding Continuity
465
10-6-4-1 Meter Procedure
465
10-6-4-2 Dale 600 - Ground Continuity
466
10-6-5 Chassis Leakage Current Test
467
10-6-5-1 Definition
467
10-6-5-2 Generic Procedure
467
10-6-5-3 Dale 600 Meter Procedure
468
10-6-5-4 Data Sheet for Chassis Source Leakage Current
469
10-6-6 Isolated Patient Lead (Source) Leakage-Lead to Ground
470
10-6-6-1 Definition
470
10-6-6-2 Generic Procedure
470
10-6-6-3 Dale 600 Meter Procedure
471
10-6-7 Isolated Patient Lead (Source) Leakage-Lead to Lead
473
10-6-7-1 Dale 600 Patient Lead Tests
473
10-6-8 Isolated Patient Lead (Sink) Leakage-Isolation Test
474
10-6-8-1 Data Sheet for ECG Leakage Current
474
10-6-9 Probe Leakage Current Test
475
10-6-9-1 Definition
475
10-6-9-2 Generic Procedure
475
10-6-9-3 Meter Procedure Using Probe Adapter
475
10-6-9-4 No Meter Probe Adapter Procedure
477
10-6-9-5 Data Sheet for Transducer Source Leakage Current
478
Section 10-7 When There's Too Much Leakage Current...
479
4
Based on 1 rating
Ask a question
Give review
Questions and Answers:
Need help?
Do you have a question about the GE LOGIQ P6 Pro Series and is the answer not in the manual?
Ask a question
GE LOGIQ P6 Pro Series Specifications
General
Brand
GE
Model
LOGIQ P6 Pro Series
Category
Medical Equipment
Language
English
Related product manuals
GE LOGIQ P6
478 pages
GE LOGIQ P6 Series
484 pages
GE LOGIQ P9
602 pages
GE LOGIQ P7
602 pages
GE LOGIQ P5
532 pages
GE LOGIQ P3 PRO
348 pages
GE LOGIQ P3 VET
348 pages
GE LOGIQ P3 EXPERT
348 pages
GE LOGIQ P5 Basic OB
532 pages
GE LOGIQ 3
127 pages
GE LOGIQ E9
808 pages
GE LOGIQ V2
317 pages