GE HEALTHCARE
DIRECTION 5394152, Revision 5
LOGIQ™ P6/P6 PRO SERVICE MANUAL
Page 4-50 Section 4-9 - Board Function Checks
4-9-12 DTRX Cooler with heatsink Function Validation Procedure
1.) Turn on the system.
2.) Check the basic function of system's different modes. Refer to the 4-3-4 "System B/M-Mode
Checks" on page 4-7 and refer to the 4-3-5 "System CFM and PWD Checks" on page 4-8.
Refer to the 10-5-2-1 "System Checks" on page 10-8.
4-9-13 ACPC II Assy set Function Validation Procedure
1.) Turn on the system. Refer to the 3-5-1 "Power On/Boot Up" on page 3-11 sequence to check AP950
Assy function. The system must show correct operation as described on sequence.
2.) Check the peripheral operation. Refer to the Section 4-5 "Peripheral Checks" on page 4-23. All
peripheral must work correctly as described Section 4-5.
4-9-14 AP950 Transbox Assy Function Validation Procedure
1.) Turn on the system. Refer to the 3-5-1 "Power On/Boot Up" on page 3-11 for power up sequence
to check AP950 Assy function. The system must show correct operation as described on sequence.
2.) Check the peripheral operation. Refer to the Section 4-5 "Peripheral Checks" on page 4-23 to
confirm the peripheral operation. All peripheral must work correctly as described Section 4-5.
4-9-15 Fuse set Function Validation Procedure
1.) Turn on the system. Refer to the 3-5-1 "Power On/Boot Up" on page 3-11 sequence to check AP950
Assy function. The system must show correct operation as described on sequence.
2.) Check the peripheral operation. Refer to the Section 4-5 "Peripheral Checks" on page 4-23. All
peripheral must work correctly as described Section 4-5.
4-9-16 ARPII Assy Function Validation Procedure
1.) ARPII Assy function can be validated by the result of 'Peripheral Test'. Once ARii Assy is replaced,
do peripheral test in order to confirm the successful installation. Refer to the Section 4-5 "Peripheral
Checks" on page 4-23.