Connect Copy Job Flow
155
3
Connect Copy Job Flow
The job flow depends on the status of the two machines.
When One of the Two Machines is Idle
One of the machines is copying Original A.
Using the idle machine as the main machine (Connect Copy)
A Make Connect Copy settings for Original B on machine <2> (the idle machine).
B Machine <2> begins copying Original B. Machine <1> also starts copying
Original B when it has finished with Original A.
A Sub-machine
B Main machine
ANP049S
ANP026S
ANP027S