3 - 53
Place the motorcycle on a fl at, level fl oor.
IMPORTANT NOTICE
Prop the motorcycle on suitable supports so that it cannot
fall.
Install:
Proceed using the opposite order to removal.
Install:
• the side locking screws ”D” Fig. A.
• the front locking screws “E” Fig. A.
to the following torque:
T
.
R
.
Torque 10 N*m
ELECTRICAL SYSTEM
INSTALLATION OF THE HEADLIGHT
A
D
D
E
COPY - Moto GB - Grant Martland - grantmartland@motogb.co.uk