Check Item Required Specications Check Result
Equipment room
net height
(without bases)
● Non-smart-busbar power
distribution scenario: ≥ 2.6 m
● Top support installation scenario
for the smart busbar:
– Single-layer smart busbar
power distribution scenario: ≥
2.8 m
– Dual-layer smart busbar
power distribution scenario: ≥
3.0 m
● Smart busbar hoisting scenario:
– Single-layer smart busbar
power distribution scenario: ≥
2.8 m
– Dual-layer smart busbar
power distribution scenario: ≥
3.5 m
□ Passed □ Failed
Floor levelness Tolerance: ±3 mm □ Passed □ Failed
Equipment room
door requirement
Height: > 2.2 m; width: > 0.9 m □ Passed □ Failed
Elevator ● Elevator bearing capacity: > 1.5 t
● Elevator internal size: height >
2.4 m; depth > 1.4 m
● Elevator door size: height > 2.2
m; width > 0.9 m
□ Passed □ Failed
Power supply 380–415 V AC (±10%); 3 Ph; 50/60
Hz
□ Passed □ Failed
Lighting ● Main equipment room: 500 lx
● Monitoring center: 500 lx
● Test area: 500 lx
□ Passed □ Failed
Floor drain DN50 or larger, made of cast iron
or stainless steel
□ Passed □ Failed
Water port Condensate drain outlet: Drains
condensate from smart cooling
products.
□ Passed □ Failed
If the requirements are not met, contact technical support.
FusionModule2000-S Smart Modular Data Center
User Manual 2 Installation Preparations
Issue 07 (2022-09-30) Copyright © Huawei Technologies Co., Ltd. 29