Step 2 Unpack the lead-acid batteries.
Step 3 Install lead-acid batteries on the lead-acid battery rack from the bottom up based
on the lead-acid battery wiring diagram.
Due to space limitation, connect power cables after placing lead-acid batteries on
one layer.
Step 4 Connect power cables to lead-acid batteries based on the lead-acid battery wiring
diagram.
----End
Follow-up Procedure
Verify the lead-acid battery cable connections. Ensure that the battery quantity
and cable connections comply with the design and the cables or copper bars are
reliably installed.
3.9.5 (Optional) Installing SmartLi Battery Modules
For details, see the documents delivered with the equipment, the documents
obtained by scanning the QR code, or
SmartLi 2.0 User Manual
and
SmartLi 3.0
User Manual
.
● Before installing battery modules, start the re extinguishing system in the
room or deploy re extinguishing facilities that comply with laws and
regulations.
● Before installing batteries, carefully read the battery safety precautions.
● During installation, wear insulated gloves and use insulated tools.
● Place the battery modules in a correct way to prevent vibrations and shocks.
● Tighten the screws on the copper bars or cables to the torque specied in this
document. Loose connections will result in excessive voltage drops or cause
battery modules to burn out when the current is high.
● Install the battery modules from bottom to top and from left to right to
prevent falling over due to imbalance.
● Two persons are required to install the battery modules.
3.9.6 (Optional) Installing a Power Distribution Box for Smart
Cooling Products
For detailed operations, see the documents delivered with the equipment or
obtain the documents by referring to the section "Reference Documentation."