1
Installation and operation precautions
1-16 C300
Installation and operation precautions Chapter 1
1.4 Space requirements
To ensure that machine operation, consumables replenishing, part replace-
ment, and regular maintenance can easily be performed, adhere to the rec-
ommended space requirements detailed below.
2
Reminder
Be sure to allow a clearance of 100 mm (4 in.) or more at the back of this
machine for the ventilation duct.
Unit: mm (inch)
C300+DF-608+FS-514+
PC-403+SD-503+OT-601
190
(7-1/2)
1212
(47-3/4)
341
(13-1/2)
394
(15-1/2)
755
(29-3/4)
100
(4)
372
(14-3/4)
1208 (47-1/2)