M126/M127/M128 6-52 SM
6.5.2 ENGINE BOARD SERVICE CHECK
Engine board service check
FRU Action
Engine board assembly
POST (Power-On Self Test)
ï‚§ The machine should complete POST in
approximately 45 seconds.
ï‚§ If the machine fails to display lights or activate the
drive motor, fuser, or fan, then check the following
order:
1. Power to the LVPS/HVPS
2. Power from the LVPS/HVPS to the engine board.
3. Cables are plugged in correctly, especially for the
operator panel. The machine will not power-up without
a functioning operator panel.
4. The operator panel (
p.6-64 "Operator Panel Service
Check")