EasyManuals Logo
Home>GE>Medical Equipment>Senographe DS

GE Senographe DS User Manual

GE Senographe DS
1810 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #1189 background imageLoading...
Page #1189 background image
GE Healthcare Senographe DS
Revision 1 Service Information and Procedures Class A 2385072-16-8EN
Job Card D/R A207 - Lift Belt
Page no. 1189 Chapter 9
JC-DR-A-207.fm
Job Card D/R A207 - Lift Belt Chapter 9
1SUPPLIES
Lift Belt
2TOOLS
Standard Tool Box
3 REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 60 minutes
4 SAFETY PRECAUTIONS
WARNING
The lift belt has a larger mechanical energy when the arm is at heights of less than the
maximum height. To minimize the risk of rapid lift belt movement due to stored mechani-
cal energy, you must ensure that the Arm is raised to its maximum height before you pro-
ceed.
WARNING
The Gantry must be powered off.
5 PREREQUISITES
• Raise the arm to its maximum height.
• Switch off the system power.
• Remove the Front and Column covers for access to
the lift belt (1) (refer to Job Card PHY A044 - Remove/
Reinstall Gantry Covers on page 523).
• Loosen and remove the Gantry curtain (refer to Job
Card D/R A208 - Gantry Curtains on page 1193).
1

Table of Contents

Other manuals for GE Senographe DS

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Senographe DS and is the answer not in the manual?

GE Senographe DS Specifications

General IconGeneral
BrandGE
ModelSenographe DS
CategoryMedical Equipment
LanguageEnglish

Related product manuals