GE Healthcare Senographe DS
Revision 1 Service Information and Procedures Class A 2385072-16-8EN
Job Card D/R A207 - Lift Belt
Page no. 1189 Chapter 9
JC-DR-A-207.fm
Job Card D/R A207 - Lift Belt Chapter 9
1SUPPLIES
Lift Belt
2TOOLS
Standard Tool Box
3 REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 60 minutes
4 SAFETY PRECAUTIONS
WARNING
The lift belt has a larger mechanical energy when the arm is at heights of less than the
maximum height. To minimize the risk of rapid lift belt movement due to stored mechani-
cal energy, you must ensure that the Arm is raised to its maximum height before you pro-
ceed.
WARNING
The Gantry must be powered off.
5 PREREQUISITES
• Raise the arm to its maximum height.
• Switch off the system power.
• Remove the Front and Column covers for access to
the lift belt (1) (refer to Job Card PHY A044 - Remove/
Reinstall Gantry Covers on page 523).
• Loosen and remove the Gantry curtain (refer to Job
Card D/R A208 - Gantry Curtains on page 1193).
1