GE Healthcare Senographe DS
Revision 1 Service Information and Procedures Class A 2385072-16-8EN
Job card D/R A252 - Compression Trolley Kit
Page no. 1337 Chapter 9
JC-DR-A-252.fm
Job card D/R A252 - Compression Trolley Kit Chapter 9
1SUPPLIES
Compression Trolley Kit (comprising Paddle Holder, and W304B Cable)
2TOOLS
Standard Tool Box
3 REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 30 minutes
4 SAFETY PRECAUTIONS
WARNING
The Gantry must be powered off.
5 PREREQUISITES
• Switch off the Gantry power.
6 PROCEDURE
1. Remove the Compression Carriage covers (refer to section 8-1 in Job Card PHY A044 - Remove/
Reinstall Gantry Covers on page 523).
2. Remove the Compression trolley (refer to section 8-2 in Job Card PHY A044 - Remove/Reinstall
Gantry Covers on page 523).
3. Change the old Compression trolley for a new Compression trolley (refer to section 8-2 in Job Card
PHY A044 - Remove/Reinstall Gantry Covers on page 523).
4. Replace the original Compression Carriage covers (refer to section 8-1 in Job Card PHY A044 -
Remove/Reinstall Gantry Covers on page 523).