GE Healthcare Senographe DS
Revision 1 Service Information and Procedures Class A 2385072-16-8EN
Job Card D/R A247 - Motorized Compression Brake
Page no. 1309 Chapter 9
JC-DR-A-247.fm
Job Card D/R A247 - Motorized Compression Brake Chapter 9
1SUPPLIES
Motorized Compression Brake
2TOOLS
• Standard Tool Box
• Mammography compression scale with digital display
3 REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 45 minutes
4 SAFETY PRECAUTIONS
WARNING
The Gantry must be powered on, mark it clearly with a warning sign to prevent others from
applying commands.
5 PREREQUISITES
• Rotate the arm to 90° for access to the Motorized
Compression Brake (1).
• Switch off the Gantry power.
• Remove the Compression Arm covers (refer to Job
Card PHY A044 - Remove/Reinstall Gantry Covers
on page 523).
1
View from the right of the Gantry