GE Healthcare Senographe DS
Revision 1 Service Information and Procedures Class A 2385072-16-8EN
Job Card ELE A021 - Networking Connection and Configuration
Page no. 625 Chapter 7
JC-ELE-A-021.fm
Job Card ELE A021 - Networking Connection and Configuration Chapter 7
1SUPPLIES
None
2TOOLS
None
3 REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 40 minutes
4 SAFETY PRECAUTIONS
None
5 PREREQUISITES
None
6 PROCEDURE
6-1 Introduction
• The Senographe system must be configured in a local network with associated devices, e.g., Review
Workstation, Archive devices, Printers, and/or other Senographe systems. A typical installation is
shown in the diagram below.
• For connection to a hospital network, a special study is required. Contact your GE HNS representa-
tive for details.
6-2 Ethernet Connection between AWS and Hospital Network
The ADS Computer should have already been connected to the Hospital Network while performing the
section 6-6, Network Connections on page 462 within Job Card ELE A021 - Networking Connection and
Configuration. However, check that the ADS Computer is still connected to the Hospital Network.
6-3 IP Addresses
This section explains how to change the Senographe system Hostname, external IP address, subnet
mask, and other parameters.
Each Senographe system is given a default external IP address during the factory check process. To
avoid conflicts (such as IP packet collision) inside the customer network, the Senographe system exter-
nal IP address must normally be changed at installation time to the recommended address given below.
For the RWS, printers, archiving device, etc., refer to their respective documentation.