EasyManuals Logo
Home>GE>Medical Equipment>Senographe DS

GE Senographe DS User Manual

GE Senographe DS
1810 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #1617 background imageLoading...
Page #1617 background image
GE Healthcare Senographe DS
Revision 1 Service Information and Procedures Class A 2385072-16-8EN
Job Card D/R A414 - Power Line Filter Box
Page no. 1617 Chapter 9
JC-DR-A-414.fm
Job Card D/R A414 - Power Line Filter Box Chapter 9
1SUPPLIES
• Power Line Filter Box
2TOOLS
• Standard Tool Box
3 REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 40 minutes
4 SAFETY PRECAUTIONS
Steps in this Job Card tell you when to take appropriate action to avoid electric shock.
5 PREREQUISITES
None
6 PROCEDURE
6-1 Removal of the Power Line Filter
1. Switch off the electrical power supply from the Mains Distribution Panel in the room. Apply an appro-
priate LOTO padlock and label. Wait 10 minutes for the components within the Generator to dis-
charge.
WARNING
It is important that you switch off the external power supply on the Mains Distribution
Panel. This is because you will be working in close proximity to where the external voltage
arrives into the Generator.
2. Remove the four Generator side panels (see Job Card PHY A042 - Remove/Reinstall Generator
Covers on page 513) to reveal the Power Line Filter.
3. Switch off the electrical power supply on the rotary switch in the Generator cabinet (position 0).

Table of Contents

Other manuals for GE Senographe DS

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Senographe DS and is the answer not in the manual?

GE Senographe DS Specifications

General IconGeneral
BrandGE
ModelSenographe DS
CategoryMedical Equipment
LanguageEnglish

Related product manuals