GE Healthcare Senographe DS
Revision 1 Service Information and Procedures Class A 2385072-16-8EN
Job Card D/R A250 - Compression Board
Page no. 1323 Chapter 9
JC-DR-A-250.fm
Job Card D/R A250 - Compression Board Chapter 9
1SUPPLIES
Compression Board
2TOOLS
Standard Tool Box
3 REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 40 minutes
4 SAFETY PRECAUTIONS
WARNING
The Gantry must be powered off.
5 PREREQUISITES
• Switch off the Gantry power.
• Remove the Compression arm covers (Refer to Job
Card PHY A044 - Remove/Reinstall Gantry Covers on
page 523) to access the Compression Board (1).
1