GE Healthcare Senographe DS
Revision 1 Service Information and Procedures Class A 2385072-16-8EN
Job Card PHY A042 - Remove/Reinstall Generator Covers
Page no. 513 Chapter 6
JC-PHY-A-042.fm
Job Card PHY A042 - Remove/Reinstall Generator Covers Chapter 6
1SUPPLIES
None
2TOOLS
Standard Tool Box
3 REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 5 minutes to remove covers, and 5 minutes to reinstall covers
4 SAFETY PRECAUTIONS
WARNING
Before beginning work, shut down the equipment and switch off the Generator hospital
supply circuit breaker. Lock it in the off position or mark it clearly with a warning sign to
prevent others from applying power.
Never switch off at the UPS except in emergency (risk of data loss).
5 PREREQUISITES
None