GE Healthcare Senographe DS
Revision 1 Service Information and Procedures Class A 2385072-16-8EN
Job Card D/R A243 - Compression Potentiometer and Cable
Page no. 1289 Chapter 9
JC-DR-A-243.fm
Job Card D/R A243 - Compression Potentiometer and Cable Chapter 9
1SUPPLIES
Compression Potentiometer and Cable (with Support)
2TOOLS
• Standard Tool Box
• Mammography compression scale with digital display
3 REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 1 hour (incl. calibrations and functional checks)
4 SAFETY PRECAUTIONS
WARNING
The Gantry must be powered off.
5 PREREQUISITES
• Rotate the arm to 0°.
• Lower the arm until you have a good access to the Compression Potentiometer.
• Switch off the Gantry power.
• Remove the arm covers (See Job Card PHY A044 - Remove/Reinstall Gantry Covers on page 523).