Step 2 Connect one end of the network cable to any GE network port on the IVS.
Figure 4-213 IVS Rear panel
Step 3 Connect one end of the power cable to the input power port on the power module
and the other end to the PDU2000 in the cabinet.
NO TE
After connecting the power cable, turn on the power switch on the panel to start the
device.
----End
4.3.6.4 Connecting a Cable to the WLDS900 Water Sensor
Prerequisites
Water sensor cables have been routed.
The monitoring cables to be connected have been prepared.
Procedure
Step 1 Connect one end of the network cable that has been routed to the water detector
to the AIDI_3 port on the ECC800-Pro.
FusionModule800 Smart Small Data Center
User Manual 4 Installation Guide
Issue 01 (2021-02-05) Copyright © Huawei Technologies Co., Ltd. 241

Table of Contents

Other manuals for Huawei FusionModule800

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei FusionModule800 and is the answer not in the manual?

Huawei FusionModule800 Specifications

General IconGeneral
BrandHuawei
ModelFusionModule800
CategoryStorage
LanguageEnglish

Related product manuals