Rigging work
12.1 Rigging work checklists for crane operation with the main boom
Operating manual GMK 6400 3 112 993 en 12 - 5
12.07.2013
12.1.2 CHECKLIST: Unrigging
H
This checklist is not a complete operating manual. There are accompanying
operating instructions which are indicated by cross-references.
Observe the warnings and safety instructions specified there.
1. If the truck crane is in the
Free on wheels working position:
Support the truck crane with the outrigger span required for the job
according to the
Lifting capacity table and raise until none of the wheels
touches the ground;
à Outriggers, p. 12 - 29
2. If required, remove the auxiliary hoist;
à CHECKLIST: Removing the
auxiliary hoist
, p. 12 - 96
3. With the RCL adjusted accordingly, unrig the counterweight;
à CHECKLIST: Counterweight, unrigging, p. 12 - 65
4. Enter the current rigging mode with the newly rigged counterweight
version on the RCL;
à p. 11 - 23
5. Retract main boom, lock telescopic sections and lock telescoping cylin-
der with telescopic section
I for on-road driving; Ã Locking the telescopic
section for on-road driving
, p. 11 - 90
s