Rigging work
12.1 Rigging work checklists for crane operation with the main boom
Operating manual GMK 6400 3 112 993 en 12 - 5
12.07.2013
12.1.2 CHECKLIST: Unrigging
H
This checklist is not a complete operating manual. There are accompanying
operating instructions which are indicated by cross-references.
Observe the warnings and safety instructions specified there.
1. If the truck crane is in the
Free on wheels working position:
Support the truck crane with the outrigger span required for the job
according to the
Lifting capacity table and raise until none of the wheels
touches the ground;
à Outriggers, p. 12 - 29
2. If required, remove the auxiliary hoist;
à CHECKLIST: Removing the
auxiliary hoist
, p. 12 - 96
3. With the RCL adjusted accordingly, unrig the counterweight;
à CHECKLIST: Counterweight, unrigging, p. 12 - 65
4. Enter the current rigging mode with the newly rigged counterweight
version on the RCL;
à p. 11 - 23
5. Retract main boom, lock telescopic sections and lock telescoping cylin-
der with telescopic section
I for on-road driving; à Locking the telescopic
section for on-road driving
, p. 11 - 90
s

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK 6400 and is the answer not in the manual?

Manitowoc GROVE GMK 6400 Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK 6400
CategoryConstruction Equipment
LanguageEnglish

Related product manuals